logo
Un buon prezzo.  in linea

Dettagli dei prodotti

Casa > prodotti >
Caricatore mobile di EV
>
200kWH Mobile Energy Storage EV Charging Station FlexCharge Mobile ESS Charging Hub

200kWH Mobile Energy Storage EV Charging Station FlexCharge Mobile ESS Charging Hub

Marchio: Mckee Charging Cube
Numero di modello: CLF-DC-200kWH
MOQ: 1
prezzo: Negotiate
Dettagli dell' imballaggio: Imballaggio in cassa di legno
Condizioni di pagamento: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Informazioni dettagliate
Luogo di origine:
Luoyang, Cina
Certificazione:
CE
Potenza nominale:
120 kW
Capacità:
200kWh
Schermo di visualizzazione:
Touchscreen da 7 pollici
Intervallo di tensione di uscita:
CC200V-750V(0-100A)
Pistola di carico:
GBT/CcS1/CCS2 opzionale (lunghezza cavo 7 m)
Dimensioni del prodotto:
1300*710*980mm
peso:
Circa 690 kg
Livello di protezione:
IP55
Evidenziare:

200kWH mobile EV charging station

,

FlexCharge mobile ESS hub

,

portable EV charger with warranty

Descrizione del prodotto
200kWH Mobile Energy Storage EV Charging Station FlexCharge Mobile ESS Charging Hub
The Maxpower IP54 CCS2 DC 120kW EV Charger Portable Charging Station provides emergency charging solutions for electric vehicles, offering reliable short-term power for new energy vehicles. This versatile system supports both AC and DC charging with standard 200 kWh capacity and 120 kW output power, with options for custom larger configurations.

 

200kWH Mobile Energy Storage EV Charging Station FlexCharge Mobile ESS Charging Hub 0
 
 
 
 
Technical Specifications
Electric Current 250A / 600A
Input Voltage 327V - 456Vac
Power Complete machine (0-2400A), Single circuit (0-25A), Super-charging (0-600A)
Output Voltage 50V - 1000V
Waterproof Level IP54
Input Frequency 45Hz - 65Hz
Work Temperature -30°C to 85°C (Derated output when temperature exceeds 50°C)
Power Factor ≥ 0.99
Operating Humidity 5% - 95% (No frost condensation)
Peak Efficiency ≥ 95.5%
Elevation ≤ 2000M
Safety Functions Short circuit protection, Leakage protection, Overcurrent protection, Emergency Stop
Material Quality PC Flame retardant
Usage Methods RFID card / Swipe card / GPRS / RS485 / CAN / Ethernet
Line Length 5M / 10M
Network Connection OCPP 1.6 protocol
Main Unit Dimensions 1355 * 995 * 2000 mm (L * W * H)
Terminal Dimensions 325 * 450 * 1430 mm (L * W * H)
Packaging Wooden Case
Key Features
  • Dual charging capability with both AC and DC support
  • IP54 rated for dust and water resistance
  • Wide operating temperature range from -30°C to 85°C
  • Multiple authentication methods including RFID and swipe cards
  • Advanced network connectivity with OCPP 1.6 protocol support
  • Comprehensive safety protection systems
  • High efficiency with ≥95.5% peak performance
  • Flexible power configurations for various applications
Flexible Shared Charging Stack
Available in 250A/600A configurations with power options ranging from 480-600-720-800-960kW to meet diverse charging requirements.
Frequently Asked Questions
How long is your delivery time?
For charging posts, it is usually 3-10 days. If there is no stock, the production lead time is determined according to the order quantity. High-power DC charging posts usually need to be customized according to the customer's technical parameters.
How long does it take to customize the prototype?
For charging piles, the prototype time is usually 7 days. For DC charging posts, the prototype time is usually 15 days. For high power fast charging stations, the technical parameters need to be determined before production, and the prototype time is usually 30 days.
How to guarantee the service?
Our products are divided into two categories: household and commercial. For home chargers, we provide standardized service: 1 year warranty + remote installation and usage guidance + video installation tutorial. For commercial chargers, we provide both standardized services and payment software docking services for operating companies.
How do you guarantee the quality of your products?
The charging post products we sell have passed GB certification in China and CE certification in EU. For some other countries, the relevant certifications are in progress.